Massive Sioux Indian Reservation Battles Snow with 3 Ploughs

As we have seen in the blizzards in Washington and New York 100s of crews of snowploughs and front-end loaders work feverishly to open roads, airports and railway tracks. But, what if you lived in the Cheyenne Sioux Indian Reservation of South Dakota and there were only three snowploughs to clear an area nearly the size of Connecticut?
Most of the reservation is covered with rural 2-lane asphalt and dirt roads that even this meagre snow removal equipment cannot reach because of the drifts. Their only hope is for the temperature to rise above freezing. If 8,000 telephone poles snapped in Potomac, Westchester, or Greenwich, crews would work 24/7 to restore power. Yet many in the Cheyenne Sioux Reservation have been without power or heat for more than five days. They daily brave temperatures and wind chills of -19◦. “Many people have died, not only of exposure but of complications from sugar diabetes,” said Russell Means, Chairman of the Lakota Republic. “Diabetes is an epidemic on Indian Reservations,” he continued “and in rural areas of Sioux country the reservations are very isolated.”





